Plastic Pallets for Shuttle Racking in a Tissue Paper Warehouse
See how three-runner HDPE plastic pallets supported a tissue paper warehouse upgrade, improving shuttle compatibility, hygiene and storage capacity.
Project overview
This is a tissue paper manufacturer upgraded its finished goods warehouse from floor stacking and conventional pallet racking to a high-bay shuttle racking system. The aim was straightforward: store more finished goods within the existing building. Tissue products are relatively light, but they take up a great deal of space.The warehouse has deep storage lanes with blue uprights and red shuttle rails. Stretch-wrapped loads of finished paper products are stored on red, three-runner solid-deck plastic pallets. Reach trucks and electric stackers transfer loads at the lane entrances; pallet shuttles then move them along the rails for storage and retrieval.
Why the existing pallets had to change
The warehouse previously used timber pallets. Four practical problems drove the change.
- Storage capacity had reached its limit. Wide aisles in the conventional racking layout left less than half of the warehouse floor area available for storage. During peak periods, stock spilled into aisles and other open spaces.
- The existing timber pallets did not suit the shuttles. Their underside support arrangement and dimensional variation prevented reliable shuttle access. With use, distortion, loose nails and damaged boards also increased the risk of jams and pallet breakage.
- Pallet hygiene was affecting deliveries. Damp timber, mould and wood debris contaminated the outer packaging of paper products. This could lead to rejected deliveries at supermarket and e-commerce warehouses and difficulties with customers’ supplier audits.
- Damage carried greater consequences at height. With racking reaching 8–9 m, a cracked pallet could allow an entire load to fall. Pallet integrity was therefore a central part of the storage system’s safety requirements.
Our pallet solution
As the plastic pallet manufacturer supplying this project, we selected one-piece, injection-moulded HDPE pallets with a solid deck and three runners. These are the red pallets used in the finished goods warehouse.
- Geometry matched to the shuttle system. The solid deck and three-runner base provided rigidity and stable load support. Pallet dimensions and clearances around the shuttle lifting mechanism and racking rails were checked against the equipment drawings before the design was finalised.
- Load capacity matched to the paper products. Each unit load weighed 500–800 kg. We specified a racking load capacity of at least 1,000 kg for the intended support arrangement, leaving capacity above the operating load. Steel reinforcement can be incorporated where required.
- Virgin HDPE for a cleaner handling surface. The pallets were made from virgin HDPE without recycled material. Their smooth, washable surfaces avoided the wood debris associated with the previous pallets and helped address contamination of the outer packaging.
- Compatibility with the existing handling fleet. Four-way entry accommodated the site’s reach trucks, electric stackers and pallet trucks. Chamfered edges helped reduce edge damage during handling.s.
We also compared wood–plastic composite pallets and reinforced timber pallets. For this project, the one-piece, three-runner design was preferred for dimensional stability and sustained load support. Repair options for the alternatives were considered limited once structural cracking occurred. With the warehouse planned around a ten-year operating horizon, we recommended the all-plastic option; this planning period was not a ten-year pallet life guarantee.
What this specification means for buyers
For buyers comparing heavy duty plastic pallets for shuttle racking, the relevant figure is the racking load capacity under the actual support conditions. It should not be substituted with a static floor-stacking or dynamic handling rating. The pallet footprint, runner geometry and shuttle clearances must also match the system.
In this application, the requirement was not simply a higher load rating. It was a consistent pallet that could move through the shuttle system, support the paper products on the rails and remain straightforward to clean.
Results after installation
The warehouse upgrade and change of pallets brought improvements in storage capacity, handling and hygiene.
- More stock within the same building. Storage capacity per unit of floor area increased by 30–50% compared with the previous conventional racking layout. Peak-season overflow into aisles was largely eliminated. This was a result of the overall storage-system upgrade, including the compatible pallets.
- Smoother shuttle operation. The three-runner solid-deck pallets worked consistently with the shuttles, with no pallet jams reported during continuous storage and retrieval. Forklifts handed over loads at the lane entrances, reducing the need to enter storage lanes and the associated risk of racking impacts.
- Improved hygiene at goods receipt. Following the upgrade, pallet-related wood debris and mould contamination were eliminated, hygiene audits were passed and deliveries were no longer rejected because of dirty pallets, helping protect the customer’s supplier rating.
- Lower annualised pallet costs. The project’s pallet cost comparison uses timber pallet replacement after 1–2 years with a 5–8-year service life for HDPE pallets. These recyclable plastic pallets can be sent for material recovery at the end of their usable life, subject to a suitable recycling route. Actual service life and annual cost depend on handling, inspection and damage rates.
- Better control of risks in high-bay storage. The all-plastic construction removed timber splitting and rusting nails from this application and avoided the moisture-related deterioration described for the previous pallets. This supported warehouse and EHS reviews for storage at around 8 m. Plastic pallets still require inspection and use within their approved load limits.
Lessons for similar warehouse projects
This project is relevant to tissue, household products, food and pharmaceutical businesses that need cleaner handling while moving to higher-density storage.
- Select the pallet and equipment together. For shuttle racking, drive-in racking or an automated storage and retrieval system, obtain the equipment drawings before choosing the pallet footprint and underside geometry. Involve the racking supplier, shuttle supplier and pallet manufacturer from the outset.
- Assess hygiene and whole-life cost early. For applications with comparable hygiene and automation requirements, we recommend plastic over timber. The indicative payback period is two to three years through fewer rejected deliveries, replacements and stoppages; this needs a site-specific calculation. Timber should be assessed against the actual application rather than ruled out for every facility.
The project photographs were taken on site in the customer’s finished goods warehouse. The pallets shown were supplied by our company.
Explore More Success Stories
Ready to optimize your material
handling?
Tell us about your requirements and our engineering team will deliver a custom quote
with product recommendations within 24 hours.